Build a Padel Court in Australia

Fast, Portable, Profitable

The Build Process:

Flexible Options for Your Padel Court

At Get Padel, we offer two premium construction methods to suit every need – the innovative Flexipadel portable system and the robust traditional slab-on-ground approach.

Both deliver professional-grade courts with the same high-quality play experience: premium turf, tempered glass walls, and LED lighting. Whether you’re after quick, relocatable setups for pop-ups and events or a permanent, durable venue for long-term use, our builds are designed for efficiency, sustainability, and maximum revenue potential.

Starting from $59,900 + GST, we handle everything from site assessment to handover, ensuring your court is ready to rally in no time.

OPTION 1

Flexipadel Portable System

Fast, Versatile, and Relocatable

The Flexipadel system is a game-changer for modern padel builds, using modular ceramic tiles and metal plates for a foundation that’s as stable as concrete but without the heavy groundwork.

It’s ideal for pop-up events (like Tinder-style dating mixers or championships) but versatile enough for permanent applications in urban rooftops, shopping centres, or coastal resorts. No excavation means lower costs, minimal disruption, and the ability to relocate if needed – perfect for testing demand or seasonal use.

Step-by-Step Construction Process:

  1. Site Assessment & Planning (1-3 days): We conduct a free evaluation to confirm suitability, design a custom layout, and secure any quick approvals (often no DA required as it’s classified as temporary).
  2. Foundation Assembly (1 day): Lay down the 60×60 cm ceramic tiles and weld metal plates – superior drainage ensures the court is playable just 20-30 minutes after rain.
  3. Court Installation (3-5 days): Erect steel frames, install 12mm tempered glass walls, add synthetic turf with silica infill, and set up lighting/amenities.
  4. Testing & Handover (1 day): Final checks, turf settling, and you’re ready to play.

Timeline to Playability: Total build time is typically 1-2 weeks from start to finish, with the court playable immediately after handover. Sell Point: Lightning-fast setup for pop-ups (as little as 1 day for basics), eco-friendly with no concrete waste, and fully customizable for any site – get your venue generating income sooner!

Flexipadel Gallery

OPTION 2

Traditional Slab-on-Ground Construction

Durable and Permanent

For venues demanding long-term stability and high-volume use, our traditional slab-on-ground method provides a rock-solid foundation that’s built to last.

This classic approach is perfect for warehouse conversions, tennis club upgrades, or council parks where permanence adds property value and supports heavy daily play.

Step-by-Step Construction Process:

  1. Site Assessment & Planning (1-2 weeks): Free evaluation, soil testing, custom design, and obtaining council approvals/permits.
  2. Foundation Preparation (2-4 weeks): Excavate the site, pour a reinforced concrete slab (15-25 cm thick with steel bars for strength), and install drainage systems – allow 7-14 days for curing based on weather.
  3. Court Installation (3-5 days): Build steel frames, fit 12mm tempered glass walls, lay synthetic turf with silica infill, and add lighting/amenities.
  4. Testing & Handover (1-2 days): Final inspections, turf settling, and safety checks.

Timeline to Playability: Total build time is 4-8 weeks, with the court fully playable once the slab cures (7-14 days post-pour). Sell Point: Unmatched durability for busy clubs, seamless integration with existing structures, and long-term ROI through low maintenance and high occupancy – ideal for creating legacy venues that stand the test of time!

Both systems ensure a professional playing surface approved for tournaments, with options for add-ons like scoreboards or spectator seating. Contact us for a free quote to find the best fit for your site!